| Date: |
8-22-2007 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Cabin Frame Construction |
|
|
- Drilled the upper F631B strap to the aft channel using the same process as used on the lower strap. - Clamped the foreward F631 channel halves to the assembly and measured and drilled the channel to strap attach holes. - Drilled the forward F631E plate to the forward channels. |
||