Date:    6-30-2007
Number of Hours:    2.50
Brief Description:    Electric Flaps
- Drilled clevis ends out to 1/4" - Completed the F680 block and temporary fit the flap actuator in the baggage compartment using the F661 and F680 bearing blocks. Marked the area to be cutout of the F748 aft tunnel cover. - Fabricated the F766C plate and F766B angle.