| Date: |
6-23-2007 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Floors and Control Rod Tunnel |
|
|
- Pop riveted the aft seat floors into place. - Fabricated the F741A-L&R and F741B control rod tunnel pieces. Match-drilled and riveted together. - Countersunk and riveted the nutplates on the control rod tunnel. - Removed the forward skins & drilled the screw holes to 5/32". Attached the nutplates for the control stick covers. -Reinstalled the forward seat skins. |
||