| Date: |
9-10-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Longeron prep |
|
|
Triple-measured, then cut the longerons to proper length. Trimmed the aft end according to the drawing and polished the front end. Marked the bend locations on each longeron. |
||