| Date: |
3-30-2006 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
F705 Bulkhead work |
|
|
Drilled the 705K and 705L to the upper bulkhead. Used the vise, some angle and steel bar stock to make a jig to fabricate the 4-degree bend along the centerline of 705K. Then used a plastic mallet to tap the angle into the pieces and verified with a block I had cut with a 4-deg incline. |
||