| Date: |
3-26-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
F705 Bulkhead Work |
|
|
Finished drilling the F-634-R seat belt anchors to the lower bulkhead assembly. Ground the flanges of two of the eight anchors that required it for rivet hole clearance. Fabricated the F705G-L&R angles. |
||