Date:    12-26-2017
Number of Hours:    7.00
Brief Description:    Wired Pitot Probe
Match-Drilled the Dynon Pitot Probe to the SafeAir mast. Mounted the heating controller to the wing rib and ran the wiring between the controller and the wing root.