| Date: |
9-19-2005 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Mount Left Aileron, flap hinge work |
|
|
Installed the left aileron bell crank and bc-to-aileron push rod. Attached aileron and aligned, adjusted tie rod. Torqued all fittings. Drilled flap hinge to brace and trailing edge skin. |
||