| Date: |
7-7-2005 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right Fuel Tank and Wing Work |
|
|
(1) Connor dimpled the right wing walk doubler using the C-frame, while I helped by aligning the dimple die on the holes, and he hammered. (2) Clecoed the top skins and doubler to the wing skeleton and verified wing twist w/n 1/16". (3) Clecoed right fuel tank stiffeners to skin and match drilled. (4) Clecoed baffle/rib assembly to skin and countersunk skin to baffle holes. Also drilled skin to spar screw holes to #19. |
||