| Date: |
1-17-2005 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
L. Elevator prep and riveting |
|
|
Fit-checked elevator trim servo assembly to elevator and discovered needed to trim off portions of the nutplate and E615 and 616 stiffener plates to get a smooth fit. Verified unimpeded servo travel through range of motion and then reprimed left elevator bay and servo bracket/coverplate assembly to repair scratches caused by the fitcheck process. Riveted left elevator skeleton. |
||