| Date: |
10-24-2004 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Drilled HS, Right Side |
|
|
Same as left side. Still had the same trouble right angle drilling through the spar, but the 404 flange was well within tolerance on this side. Went much quicker since I'd just done the left side. |
||