| Date: |
7-21-2019 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Inlet Ducts and Oil Filler Door |
|
|
Fabricated and installed the oil filler door. Also trimmed and prepped the upper inlet cooling air ducts and then epoxied them into place. |
||