| Date: |
10-12-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Sec 43-6 & 43-7 all steps |
|
|
Clamped then drilled the cabin door posts to the fuse uprights. I got a tip from Dean when he visited regarding the gussets they countersunk them for flush rivets. I'm going to do this as well. However I decided to mount the gusset on the inside of the upright channel so that with flush rivets the whole face can be filled and made smooth. I had to bevel the aft side of the lower portion of the gusset in order to get it to align with the pilot holes. should make for a more appealing interior. |
||