Date:    1-30-2006
Number of Hours:    7.40
Brief Description:    Sec 17-5 steps 1-40 right
Installed Duckworks 100w. halogen landing light into RIGHTwing assembly. Includes mounting the liaght barcket, installing the light, and cutting and fitting the lens. This went a little faster that the Left, but it still took a long time.