| Date: |
12-22-2005 |
|
| Number of Hours: |
2.75 |
|
| Brief Description: |
Sec 14-3 steps 1-4 right |
|
|
Straightened flanges on all Right wing ribs, Clecoed to spar, match drilled, enlarged hole w/ step drill to 3/4" for electrical conduit in all ribs, Drilled #12 Holes in All but last 3 ribs, dissassembled, and deburred all holes in spars and ribs, deburred the flap hinge assemblies and the inboard flap hinge and torque tube bracket assembly. next step Scotchbrite and prime. |
||