Date:    11-21-2005
Number of Hours:    1.25
Brief Description:    Sec 22-2 steps 1-3.
Gather all of the parts for flaps, strip off the blue film, and begin to prep. MAde the 3rd cradle. Drilled the left hinge brackets.