| Date: |
11-4-2005 |
|
| Number of Hours: |
6.70 |
|
| Brief Description: |
Sec 18-5 step 6 left continued |
|
|
Finish riveting w/Pro Seal all of the remaining ribs in the LEFT tank, also installed and riveted the Fuel cap Flange and vent line retainer clip. w/ Pro Seal. It takes about 1.5 hours per rib, the riveting actually goes pretty fast, it's all of the Pro Seal prep and clean-up along the way that takes the time. I'm getting tired ot TANKS and Pro Seal, I can see why some have moved ahead to other parts, this is a GRIND. |
||