| Date: |
11-2-2005 |
|
| Number of Hours: |
8.25 |
|
| Brief Description: |
Sec 18-5 steps 4-5 |
|
|
Riveted w/ Pro Seal. all stiffeners, for BOTH tanks, and installed drain plug in Both tanks and Fuel cap Flange in Right tank. This Pro-Seal stuff is without a doubt the pits. After a while you just get used to the mess and the constant clean-up |
||