| Date: |
10-21-2005 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Sec 18-2 &3 steps5-6 and 1-2 L |
|
|
Clecoed the Stiffeners and the ribs to theLEFT skin. Match Drilled, the stiffeners, Match Drilled the Ribs, Inserted the J CHannel stiffener and Match Drilled, Cleco the Tank Attach Bracket and Match Drill. |
||