| Date: |
10-10-2005 |
|
| Number of Hours: |
3.10 |
|
| Brief Description: |
Sec 17-2 steps 1-4 |
|
|
Flute and straighten all of the ribs for the LE (L & R), fab a piece of J channel stiffener (had to call Van's as one of the J channels in the bundel was 'punched' with some errant holes. I can do one side while I wait for the part. Trim a couple of the ribs to fit around the spar caps, and then make cradles to hold the LE's and tanks (next section). |
||