REceived the F1024 L&R rear seat pans so went back and completed Sec 33-2 steps 1-4. The rest of today was a lot of match drilling, deburring, dimpling, Looking back doesn't look llike much progress, but this is a lot like skinning a wing, there are a ton o fholes in skins and ribs that all have to be drilled, dimpled, deburred. i've also scotchbrited everything so the parts are pretty much ready for prime. The Com antennas are suppose to arrive on Monday, and they need to be installed befor the baggage floors get riveted down, I'm guessing that will be Next Tues.
|