Date:    4-27-2006
Number of Hours:    1.50
Brief Description:    Sec 31-10 steps 1-4
Rivet the Instrument attach flanges to the top skin and sub-structure, then rivet the hand grips to the top skin and attach flanges. Now this is done, it gets stored until later.