| Date: |
4-19-2006 |
|
| Number of Hours: |
3.25 |
|
| Brief Description: |
Sec 31-6 and Sec 31-7 All steps |
|
|
Fabricated the instrument panel and attached the entire assembly to the Fuse, Match drilled everything, including the hand hold doublers. I don't intent to use this instrument panel, but rather a fiberglass one with a little more horizontal room, but the sub-structure is the same, and this provides significant stability during the interim. |
||