| Date: |
4-20-2014 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Wing Preparation |
|
|
EAA advisor inspection prior to closing up center section fuel tank; prepared to install lower skin; using silicone I applied numerous dollups on tank; then applied T88 adhesive to all contact points for skin; clamped in place and installed brads about every one inch or so around perimeter. Varnished LE and new skin over center section fuel tank. |
||