Date:    10-11-2013
Number of Hours:    8.00
Brief Description:    Wing Hardware Prep and Paint
fabricated, drilled, and tapped tie down fittings to lower spar plates; weld the same; sand blast, clean and paint with 2 part epoxy primer.