| Date: |
10-11-2013 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Wing Hardware Prep and Paint |
|
|
fabricated, drilled, and tapped tie down fittings to lower spar plates; weld the same; sand blast, clean and paint with 2 part epoxy primer. |
||