| Date: |
3-24-2011 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Electrical |
|
|
Made up a bonding strap from engine mounting lug to the engine mount frame. I removed the epoxy from the mount frame for about 1/3 diameter of the tubing and applied dilectric grease before installing the tubing clamp. The lug was crimped and soldered. I purchased a firewall fitting that is supposedly a fire break. Installed and mounted to firewall. 1/2 inch diameter |
||