| Date: |
2-26-2011 |
|
| Number of Hours: |
7.50 |
|
| Brief Description: |
Engine |
|
|
Using some .040 mild sheet steel, I fabricated a bottom for the battery box. I also fabricated hold down guide tubes and welded those to the side of the box using som 3/8 tubing. I also began laying out backer plate for attachment points and clamp attach points; Prepared for and installed nut plate on backer plate for the battery box |
||