| Date: |
2-22-2014 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Covering Wing |
|
|
More ironing of tapes. Installed Bias tape to wing tip bows both sides. Installed drain grommets and inspection panels to lower wings. Applied TE tapes and glued in place. |
||