| Date: |
4-25-2011 |
|
| Number of Hours: |
2.20 |
|
| Brief Description: |
Engine Cowling |
|
|
Flush riveted upper 2 cowling stiffeners; Decided to rebuild the sheet metal over the fuel tank because it was a bit flimsy at .025. Since I have lots of .032, I thought I would make the improvement. So, using the .025 panel, I layed out, cut and drilled to match. |
||