| Date: |
4-23-2011 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Engine Cowling |
|
|
Layed out left hand cowling door with construction paper, then .032 aluminum, but quickly found that that thickness is too stiff. So, using some .025 aluminum, I layed out, cut, and attached the left cowl door. Layed out and drilled holes for attachment to hinge line. |
||