| Date: |
7-10-2010 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Miscellaneous |
|
|
torqued rod end bearings and rod fittings. Installed torque seal; Prepared and put in epoxy the head rest panel and avioncs access panel; Fabricated 6 tabs and welded the same to trailing gear leg tubing to attach brake line; drilled holes in gear leg cross member to accept brake line. |
||