| Date: |
12-12-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Riveted top skin on |
|
|
Added corateck corrosion proofing down seam, riveted with A4 and A5 Rivetes. checked with digital inclinometer down the top of fuselage. have 0.3 degree twist so I stopped riveting 3/4 of the way down, will try to correct before addding more rivets |
||