Date:    12-12-2019
Number of Hours:    2.00
Brief Description:    Riveted top skin on
Added corateck corrosion proofing down seam, riveted with A4 and A5 Rivetes.
checked with digital inclinometer down the top of fuselage. have 0.3 degree twist so I stopped riveting 3/4 of the way down, will try to correct before addding more rivets