| Date: |
11-25-2019 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
AN fitting and Fuel line form wings |
|
|
Installed rubber grommets. Installd AN nut and Ferrel Flared tubing with 37 deg flare tool, Nut and ferrel would not go through grommet..... so cut off flare installed tubing though grommets installed nut and ferrel and flared while on the plane. |
||