| Date: |
11-23-2019 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Header Tank install |
|
|
Added square tubing to floor mounts for header tank. Added a L brace to side of fusulage. Drilled with #40 bit on a 40 pitch Drilled out with #30 for A4 rivets debured and added coratec to L brace and bracket Drilled brackect that goes between l brace and header tank with #20 bit for A5 rivets on 30 pitch |
||