| Date: |
11-10-2019 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Brake Lines and master Cylender assembly |
|
|
Removed Fire wall Lois debured and added Cortech to edges. Added Teflon tape to NPT fittings Installed Lines Looped outlet to matain seal Added adle clamps on hoses and installed carter pins on castel nuts. Reinstalled Firewall. |
||