| Date: |
11-5-2019 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
lower noes gear strut mount |
|
|
Worked on lower noes gear strut mount.75L1-7 made a pattern from 1/8 plywood to find position to drill center fire wall stiffner for AN3 bolt Predrilled 75l-1-7 for 4 AN4 bolts. Then Drilled with #3 bit on drlll press to be tapped for AN4 bolts. |
||