| Date: |
11-2-2019 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Left D0or seal |
|
|
Replaced A5 rivets AS5 rivets on Right side Left side Drilled panted and installed New Frame Gusset pn C75N-2 Drilled out rivets from old Cabin Frame Gusset PN 75 12- 4 and removed. Made a pattern from 75-12-4. Bent Doubler |
||