| Date: |
7-9-2009 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Left Elevator Match-drilling |
|
|
Match-drilled all the #40 and #30 holes in the left Elevator. Drilled the bottom spar to skin holes to #30 as I will use the CS4-4 blind rivets in this location. |
||