| Date: |
1-2-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilling HS 908 Brackets |
|
|
Clamped the two brackets together to drill the top-center alignment hole so they will be in precisely the same position on each bracket. Drilled pilot holes and then drilled the holes to #30. Finished deburing and polishing the brackets. The two lower holes are "drilled in assembly" so have only marked their eventual location. |
||