| Date: |
5-5-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right Elevator |
|
|
Final drilled the right elevator skeleton. Machine countersink drilled the elevator spar to the E-709 tip rib. Final drilled the Elevator horn to the skeleton. Clecoed the right elevator skin to the skeleton and final drilled skin. |
||