| Date: |
5-2-2010 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Prepared Right Elevator |
|
|
Dimpled the stiffeners and Elevator Skins. Riveted the stiffeners to the Elevator Skins. Match drilled the Elevator tip ribs to the Elevator Spar and drilled the elevator weights. Smashed the elevator trailing edge. |
||