| Date: |
4-25-2010 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Rudder |
|
|
Riveted the Rudder skins to the Spar and Ribs. Rolled the leading edge using 3/4" galvenized water pipe and installed rivets to hold the edges together. |
||