Date:    3-27-2013
Number of Hours:    3.00
Brief Description:    Continued with inspection.
Performed most engine inspection checklist items. Disconnected left carb and checked bowl - clean as a whistle.

Removed remaining prop hub parts and inspected. Touched up paint on engine flange. Reinstalled prop and set pitch.