Date:    6-26-2018
Number of Hours:    0.00
Brief Description:    Completed ADS-B install, began HS upgrade.
Tidied up the wiring for the echoUAT. Labeled old data wires. Dissassembled HS to the point of the inspection. Found no cracks.