| Date: |
10-21-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Finished data cable, installed tunnel cover. |
|
|
Went to Albany for my FAA physical this morning. Now the Arrow annual and my annual are on the same schedule. This afternoon I finished the data cable hookup. Tested it with a serial extension cable and the serial to USB converter. Was able to communicate just fine between the laptop and the Dynon. See photo 1 for cable routing. Pinouts as follows: Dynon DB25 Pin 9 - PC DB9 Pin 5 WHT/BLK Dynon DB25 Pin 10 - PC DB9 Pin 2 WHT/ORG Dynon DB25 Pin 22 - PC DB9 Pin 3 WHT/YEL Got inside the cockpit and labeled the "spare" wires in the tunnel. Then installed the mounting plates and the tunnel cover. |
||