| Date: |
3-21-2010 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Worked on hinges and pins, cowling parts. |
|
|
Before church: Jumped to Page 38-07 to cut out the hole for the oil door. Figured I might as well make more dust before I cleaned up the shop. Used the Dremel tools and sandpaper to make a nice smooth opening. Put away all the fiberglass working tools and cleaned up the dust. After chuch: Fabricated all the hinges and pins specified on Pages 38-03 and 38-04. Really confused by some of the figures but think I got them right. Cut out and deburred the oil door. Built a template for marking all those hinge halfs that have to be marked for the one inch spaced holes. |
||