| Date: |
6-13-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Riveted baggage floor, installed nutplates. |
|
|
Finished remaining steps on page 21-02. Gave the -8 rivets one more squeeze with the new Avery die. Set the LP4-3 rivets in the floor. Dimpled and installed lots of nutplates. Located the parts needed for the next page. |
||