| Date: |
5-26-2009 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Prepped parts for Section 20. |
|
|
Had a nice Memorial Day weekend, but got no time in on the project. Today deburred and primed parts for Section 20, Center Section Bulkhead. There was a lot of work on F-1204, the big spar carry-throgh assembly. Used the big wheel for long straight edges, and the 1" scotchbrite wheel for the cutouts and smaller radius cuts. Same with the F-1294D Aft Bulkhead, and assorted small parts needed for Section 20. Consulted with brother-in-law John Hines, who gave up a promising career as a de-burrer to become a professional musician. Ready to do some actual assembly steps at next work session. Tomorrow I'm off to Indiana for an overnight trip. Looks to be a long IFR trip. |
||