| Date: |
10-2-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilled cone, checked clearances with trim. |
|
|
Drilled the 3/4" hole in the bottom of the cone. Re-installed stabilizer and trim mechanism. Then put the cone in place to check clearances. Ran the trim full deflection both ways, checked correctness of movement and clearances. |
||