Date:    7-3-2020
Number of Hours:    0.00
Brief Description:    Worked on windshield fitting.
Installed grommet edging strips on aileron cable pass-through locations.

With Sam - Did more trimming on windshield and applied felt strips. Experimented with heat softening of Plexiglas on scrap piece. Dry fit windshield with metal strips.

Installed missing clamps on exhaust system.